Ask HiltiAskLearnArticles
Ask Hilti

System No HW-S-0145

Posted by Carson Goerz27 days ago
System No HW-S-0145

Canadian Code requires a FT fire stop where walls meet ceilings as per the detail above.
Does this detail provide a 1 hour FT rating if the ceiling GWB is mounted to resilient channels not directly to the joists?
Acoustic consultants require the ceiling top GWB to be spaced away from the wall GWB 1/8 - 1/4", does this comply with testing requirements?

1 hour,WALL/CEILING,JOINT

1 Reply
Posted by Ghina Kabbara26 days ago
Hilti Verified

Hi Carson

Can you please send us details and drawings showing the case to cafirestop@hilti.com so we can better assist you.


firestop

Content is loading